Ontario’s annual filing for large buildings — what it is, who it catches, and what it takes to file properly.
EWRB stands for Energy and Water Reporting and Benchmarking. It is Ontario’s rule requiring large buildings to report, every year, how much energy and water they used.
Most owners meet it for the first time through a letter rather than a plan, and the first question is always the same: does it apply to me, and what happens if it does.
The provincial rule is Ontario Regulation 506/18. It reaches commercial, institutional and multi-unit residential buildings of 50,000 square feet and over, and the report is due 1 July every year. Buildings of 100,000 square feet and over must also have the filing verified — in the first year, and every five years after that.
The City of Toronto runs its own bylaw on top of the provincial rule, due 2 July annually, with no building-type exemptions — so a building exempt provincially can still owe the City a report. From 2027 Toronto’s threshold drops from 50,000 square feet to 10,000, with the first report under it due 2 July 2027. That brings in thousands of mid-sized buildings whose owners have never used Portfolio Manager.
Because a filing covers a full calendar year, a building entering scope in 2027 needs its meters mapped and its data collection working before that year starts.
Thresholds and deadlines above checked 14 October 2026. Confirm yours against the regulation and the City bylaw before you rely on a date — both have changed before, and we keep the sourced version on our commercial site, linked at the foot of this page.
A full calendar year of consumption for every meter, including the ones nobody remembers — house meters, parking, amenity space, a sub-meter feeding a retail unit. It is entered and benchmarked in ENERGY STAR Portfolio Manager and submitted before the deadline.
The work is rarely the submission. It is assembling twelve consecutive months across accounts opened at different times, under different names, with gaps where a supplier changed. That is why this is worth starting months ahead rather than weeks.
A benchmarked building has a score, and a score is a comparison against buildings of its own type across the country. It tells a board in one number whether the building is expensive to run, and it is the starting point for most incentive applications that follow.
A complete Portfolio Manager profile, the submission filed, and a plain statement of where the building sits against its peers.
Owners and managers of multi-residential, office, institutional and mixed-use buildings at or above the reporting threshold.
More detail, on our commercial site: The full EWRB guide, with the current thresholds and dates →
Commercial & industrial enquiries
Our commercial and industrial work has its own enquiry form, on our dedicated site for it. It asks the things this work turns on — floor area, what is driving the decision, whether you need a compliance filing or an investment case — so the first reply you get is useful rather than a request for more information.
Request a proposal →or speak to someone: 1 (800) 203-4395
Licence 9E
A measured assessment by a registered advisor — an EnerGuide evaluation, an ASHRAE audit or a modelling study — a report you can act on, and an honest answer about which programmes apply where you are.